Skip to content
Manager System
Lock reference · Draft
v0.1.0

Run the Team Operating Cadence

Run the minimum recurring planning, coordination, decision, learning, and improvement mechanisms needed to keep team work visible and moving.

Adopt · export.mdAdopt · export.jsonDraft reference — not a fitted standard

Profile

Purpose

Synchronize work and decisions at the rhythm the operating system requires without turning management into a stack of status meetings.

Intended outcome

A reliable cadence in which current priorities, constraints, dependencies, decisions, risks, commitments, feedback, and improvements reach an owned next state.

Accountable
Manager
Operator
Cadence owner
Use when
  • — A Manager Operating Charter launches.
  • — Team coordination depends on informal memory or founder intervention.
  • — Meetings multiply while decisions, dependencies, and actions remain unclear.
  • — Work spans functions, sites, shifts, disciplines, projects, or different time horizons.

Entry gate

  • A current Manager Operating Charter, team purpose, work cycle, recurring decisions, and interfaces exist.
  • Each proposed cadence event has a defined purpose, participants, inputs, outputs, and owner.
  • Urgent, specialist, safety, quality, incident, and people matters have routes outside the normal cadence.

Exit gate

  • The cadence is superseded or retired through a controlled review.
  • Open decisions, actions, risks, dependencies, records, and recurring obligations transfer to an accepted owner.
  • The disposition and learning are preserved in the manager-system record.

Flow · 7 controlled steps

  1. 01

    Design the cadence system

    Match recurring mechanisms to the team’s natural work and decision cycles.

    • — Inventory existing meetings, asynchronous updates, shift handoffs, reviews, dashboards, and informal coordination.
    • — Map recurring planning, coordination, decision, customer, risk, learning, feedback, and improvement needs by horizon.
    • — Define the smallest useful set of events and asynchronous mechanisms and remove duplication.
    • — Set purpose, participants, frequency or trigger, preparation, facilitator, decision authority, outputs, records, and cancellation rules.
    Responsible
    Manager
    Output
    Team Cadence Architecture
    Decision
    Does every cadence element perform necessary operating work at the right rhythm?
  2. 02

    Prepare the operating state

    Make current evidence available before synchronous attention is consumed.

    • — Update agreed work, outcome, flow, quality, capacity, dependency, risk, decision, action, and guardrail evidence at its source.
    • — Identify changes, exceptions, conflicts, blocked work, decisions needed, and items suitable for asynchronous closure.
    • — Invite participant agenda items with the decision or help needed.
    • — Route urgent and specialist matters immediately rather than waiting.
    Responsible
    Cadence owner and work owners
    Output
    Team Operating State · Decision-focused agenda
  3. 03

    Orient to outcomes and priorities

    Create shared situational awareness without turning the event into serial status narration.

    • — Confirm purpose, intended outcomes, current priorities, material changes, and time horizon.
    • — Review only meaningful movement, variance, uncertainty, and guardrail signals.
    • — Surface conflicting demands and assumptions and distinguish fact, interpretation, and forecast.
    • — Move detailed problem-solving to the smallest qualified group where appropriate.
    Responsible
    Cadence owner
    Output
    Shared Current-State View
    Decision
    What changed enough to require coordination, decision, support, or escalation?
  4. 04

    Coordinate work and dependencies

    Protect flow across people, disciplines, systems, shifts, and connected processes.

    • — Review near-term commitments, capacity, constraints, queues, dependencies, handoffs, and resource conflicts.
    • — Confirm what will continue, stop, start, change, or wait and the effect on customers and connected teams.
    • — Assign dependency owners and receiving-owner acknowledgements.
    • — Keep detailed task administration in its source workflow rather than duplicating it in meeting notes.
    Responsible
    Manager and work owners
    Output
    Coordinated Work Commitments
    Decision
    Which coordination changes are necessary to protect the most important flow?
  5. 05

    Make decisions and escalate constraints

    Move issues through explicit authority instead of allowing repeated discussion.

    • — State the decision, evidence, options, constraints, affected parties, urgency, and recommended owner.
    • — Use the chartered decision method and record outcome, rationale, dissent, conditions, and review trigger.
    • — Escalate beyond-authority matters with minimum sufficient context, requested decision, fallback, and response need.
    • — Route governed safety, quality, privacy, security, conduct, employment, or other specialist matters to qualified processes.
    Responsible
    Named decision owner
    Output
    Team Decision Record · Escalation Handoff
    Decision
    Can this decision be made here with sufficient evidence and authority?
  6. 06

    Close commitments and communicate

    Translate the cadence event into one authoritative operating state.

    • — Confirm decisions, changed priorities, commitments, owners, timing, dependencies, risks, and escalations.
    • — Update source workflows and records rather than creating a competing shadow list.
    • — Communicate changes to absent participants and affected upstream and downstream owners.
    • — Invite factual correction and confirm the next trigger or cadence point.
    Responsible
    Cadence owner
    Output
    Updated Team Operating State · Connection Notices
  7. 07

    Review and improve the cadence

    Keep recurring mechanisms useful as work and context change.

    • — Review decision flow, commitment reliability, dependency resolution, participation, preparation, load, duplication, accessibility, and guardrails.
    • — Seek participant and connected-owner evidence about value and missing mechanisms.
    • — Distinguish cadence design, manager practice, authority, capacity, process, system, and organization causes.
    • — Change frequency, purpose, participation, evidence, facilitation, or asynchronous design prospectively and retire low-value elements.
    Responsible
    Manager
    Output
    Cadence Health Review · Updated Team Cadence Architecture
    Decision
    What change would improve operating value relative to attention cost?

Connections

Seams · 12 hops within 2 steps

Upstream and downstream neighbourhood over public reference processes only. Each hop shows the trigger, carried objects, and what the receiving process loses if the producing step is skipped.

downstream · hop 1

Open process

Enable Decisions and Escalation

Trigger · A decision requires focused work or authority outside the cadence event.

Carries · Team Decision Record · Escalation Handoff

If Make decisions and escalate constraints is skipped, Enable Decisions and Escalation loses Team Decision Record · Escalation Handoff.

downstream · hop 1

Open process

Manage Team Capacity and Priorities

Trigger · The cadence identifies a capacity or priority decision.

Carries · Team Operating State · Coordinated Work Commitments

If Prepare the operating state; Coordinate work and dependencies is skipped, Manage Team Capacity and Priorities loses Team Operating State · Coordinated Work Commitments.

downstream · hop 1

Open process

Review Manager-System Health

Trigger · The manager-system review point or material signal occurs.

Carries · Cadence Health Review

If Review and improve the cadence is skipped, Review Manager-System Health loses Cadence Health Review.

downstream · hop 1

Open process

Run Manager Check-ins and Feedback

Trigger · A matter requires an individual operating conversation.

Carries · Relevant Team Operating State extract

If the handoff from Run the Team Operating Cadence is skipped, Run Manager Check-ins and Feedback loses Relevant Team Operating State extract.

upstream · hop 1

Open process

Establish the Manager Operating Role

Trigger · The Manager Operating Charter launches or changes.

Carries · Manager Operating Charter · Manager Operating Cadence

If Design the management cadence; Approve and launch the operating charter is skipped, Run the Team Operating Cadence loses Manager Operating Charter · Manager Operating Cadence.

downstream · hop 2

Open process

Align Role Outcomes and Expectations

Trigger · The manager charter is approved or changed.

Carries · Manager Operating Charter

If Approve and launch the operating charter is skipped, Align Role Outcomes and Expectations loses Manager Operating Charter.

downstream · hop 2

Open process

Approve Workforce Need and Headcount

Trigger · Evidence indicates a durable gap requiring a workforce response decision.

Carries · Capacity and Priority Review · Workforce Handoff

If Review outcomes and improve capacity design is skipped, Approve Workforce Need and Headcount loses Capacity and Priority Review · Workforce Handoff.

downstream · hop 2

Open process

Build and Operate a Development Plan

Trigger · Development is an approved response to a capability finding.

Carries · Development Handoff

If the handoff from Review Manager-System Health is skipped, Build and Operate a Development Plan loses Development Handoff.

downstream · hop 2

Open process

Redesign Work and Workflow

Trigger · The diagnosis identifies work or process design as a material cause.

Carries · Improvement Handoff

If the handoff from Review Manager-System Health is skipped, Redesign Work and Workflow loses Improvement Handoff.

downstream · hop 2

Open process

Review Performance and Contribution

Trigger · The authorized formal review point occurs.

Carries · Formal Process Evidence Summary

If Review patterns and improve is skipped, Review Performance and Contribution loses Formal Process Evidence Summary.

upstream · hop 2

Open process

Define Role and Success Profile

Trigger · The manager operating role is chartered.

Carries · Role Success Profile

If the handoff from Define Role and Success Profile is skipped, Establish the Manager Operating Role loses Role Success Profile.

upstream · hop 2

Open process

Maintain Job and Career Architecture

Trigger · A manager role is created or materially changed.

Carries · Approved Job and Career Architecture · Role Mapping Record

If Approve and publish the architecture is skipped, Establish the Manager Operating Role loses Approved Job and Career Architecture · Role Mapping Record.

Roles

Manager

Owns the cadence system, priority tradeoffs, authority use, escalation, burden, and improvement.

Cadence owner or facilitator

Prepares the state, protects purpose, controls flow, records decisions, updates systems, and closes connections.

Team member

Maintains source evidence, surfaces changes and dependencies, contributes expertise, makes commitments, and corrects the record.

Named decision owner

Makes or routes decisions with evidence, rationale, conditions, and accountability.

Process or connected-work owner

Accepts dependencies, decisions, escalations, and interface commitments.

Systems + Data

Data object

Team Cadence Architecture

Defines the complete set of recurring operating mechanisms and their contracts.

System of record · Manager or process repository

Data object

Team Operating State

Provides the current inspectable state of outcomes, work, flow, capacity, dependencies, decisions, risks, and guardrails.

System of record · Work and process systems of record

Data object

Team Decision Record

Preserves the decision, evidence, authority, rationale, conditions, dissent, and review.

System of record · Decision or work-management system

Data object

Cadence Health Review

Balances operating value, attention cost, experience, defects, and improvement decisions.

System of record · Manager-system repository

Work, flow, capacity, and dependency systems of record

Required

Provide current operating state without rekeying status into presentations.

Decision, action, risk, and escalation workflow

Required

Creates authoritative states, owners, timing, acknowledgement, and history.

Accessible synchronous and asynchronous collaboration

Required

Supports relevant participation across disciplines, shifts, sites, time zones, and access needs.

Cadence health and feedback evidence

Required

Measures value, load, flow, defects, experience, and guardrails without individual surveillance.

Measures

outcome

Cadence operating value

Does the cadence improve shared state, coordination, decision flow, and adaptation relative to its attention cost?

Combined review of decisions, resolved dependencies, commitment reliability, participant evidence, outcome movement, and time cost; not meeting satisfaction alone.

Monthly or quarterly

quality

Material-item closure quality

Does every material item leave through a decision, commitment, evidence request, or acknowledged route?

Material agenda items with complete state, owner, timing, and source update divided by all material agenda items.

Per event

cycle-time

Decision and dependency flow time

How long do ready decisions and material dependencies wait for accepted disposition?

Elapsed time from ready state to decision or acknowledged dependency outcome, by type, authority, and wait cause.

Weekly or monthly

adoption

Authoritative state adoption

Are participants preparing from and updating source systems rather than shadow reports?

Applicable items sourced from and closed in authoritative systems divided by all applicable items.

Monthly

exceptions

Cadence exception pattern

Where do preparation, attendance, evidence, decisions, commitments, interfaces, or system updates fail?

Exceptions by mechanism, type, owner, severity, cause, recurrence, and disposition.

Monthly or quarterly

guardrail

Attention, access, voice, safety, quality, and privacy guardrail

Does cadence create overload, exclusion, silence, performative reporting, unsafe delay, quality loss, or inappropriate individual monitoring?

Context-specific review of time load, participation, shifts, access, voice, safety, quality, privacy, and participant feedback; not a causal or legal conclusion.

At every formal cadence review

Evidence + judgment

Team Operating Cadence

cross-source-synthesis

Supports recurring planning, coordination, decision, review, feedback, and improvement aligned to work horizons.

bicycle-guide · team-operating-cadence · hr-practice-and-talent.artifact.json

Meeting Effectiveness and Load

cross-source-synthesis

Supports purpose, necessary participation, preparation, facilitation, decisions, actions, records, accessibility, load review, and removal.

bicycle-guide · meeting-effectiveness · hr-practice-and-talent.artifact.json

Visual Management and Current-State Evidence

cross-source-synthesis

Supports visible current work, flow, abnormalities, ownership, and action at the point of use rather than reconstructed status.

bicycle-guide · visual-management · hr-practice-and-talent.artifact.json

Cross-Functional Coordination

cross-source-synthesis

Supports shared goals, interdependence visibility, mutual adjustment, boundary ownership, and feedback.

bicycle-guide · coordination · talent-management.artifact.json

Work Flow and Constraint Management

cross-source-synthesis

Supports demand, capacity, work-in-process, queues, constraints, handoffs, realistic commitments, and flow learning.

bicycle-guide · flow-management · hr-practice-and-talent.artifact.json

Decision Rights and Accountability

cross-source-synthesis

Supports explicit decisions, evidence, authority, participation, escalation, output, and accountability.

bicycle-guide · decision-rights · hr-practice-and-talent.artifact.json

Ethical Performance Monitoring

cross-source-synthesis

Supports proportionality, transparency, minimum necessary data, participation, access control, legitimate use, and protection from surveillance.

bicycle-guide · ethical-performance-monitoring · build-a-people-analytics-function.artifact.json

Lock minimum-cadence principle

lock-judgment

Lock judgment: the cadence contains only mechanisms that perform distinct necessary operating work.

lock · lock-method

Lock state-before-meeting principle

lock-judgment

Lock judgment: authoritative current state is prepared before synchronous attention is spent.

lock · lock-method

Lock attention-on-change principle

lock-judgment

Lock judgment: cadence attention goes to change, variance, uncertainty, decisions, and blocked interfaces—not serial narration.

lock · lock-method

Lock one-work-state principle

lock-judgment

Lock judgment: cadence reads and changes authoritative work records rather than creating a parallel meeting world.

lock · what-lock-is

Lock explicit cadence-exit principle

lock-judgment

Lock judgment: a material item exits through decision, commitment, evidence request, or acknowledged handoff.

lock · lock-method

Lock self-improving cadence principle

lock-judgment

Lock judgment: recurring mechanisms are reviewed against operating value and attention cost and can be changed or retired.

lock · lock-method

Draft reference standard. Requires client context and qualified employment, labor, accessibility, safety, quality, privacy, security, conduct, data, regulatory, and jurisdiction-specific review before deployment.