Skip to content
Operating System
Lock reference · Draft
v0.1.0

Select a Business System

Choose a system from the work backward—using controlled requirements, evidence, economics, risk, and implementation fit.

Adopt · export.mdAdopt · export.jsonDraft reference — not a fitted standard

Profile

Purpose

Select the smallest suitable technology and commercial arrangement that enables the approved workflow without creating avoidable lock-in, control failure, or implementation burden.

Intended outcome

An authorized system decision with traceable requirements, comparative evidence, total economics, risks, contractual conditions, and an implementation-ready handoff.

Accountable
Client business owner
Operator
Selection lead or process architect
Use when
  • — An approved workflow requires a new system or material replacement.
  • — A current system cannot meet documented operating, integration, data, control, or scale requirements.
  • — A vendor or product has been proposed before requirements are controlled.
  • — A renewal or expansion creates a meaningful opportunity to reconsider fit and economics.

Entry gate

  • The business need, accountable owner, decision authority, budget boundary, and decision date are explicit.
  • The approved workflow and material requirements exist or are authorized for completion.
  • There are at least two realistic alternatives, including maintaining or improving the current state where credible.

Exit gate

  • The selected option and rejected alternatives are supported by traceable evidence and approved rationale.
  • Total economics, implementation assumptions, data rights, integrations, support, risks, and contractual conditions are visible.
  • Authorized client owners approve the business, technical, financial, procurement, and context-specific risk decision.
  • Implementation receives a controlled decision package without needing to reconstruct the selection.

Flow · 7 controlled steps

  1. 01

    Frame the system decision

    Establish the decision, alternatives, authority, consequences, and evidence threshold before shopping.

    • — State the business outcome, workflow need, present constraint, and consequence of no action.
    • — Name decision authority, participants, budget boundary, timing, and risk context.
    • — Include maintain, improve, build, buy, integrate, or retire alternatives where realistic.
    • — Set decision criteria and the level of evidence proportionate to cost, risk, reversibility, and uncertainty.
    Responsible
    Client business owner
    Output
    System Decision Brief
    Decision
    Is there a consequential, uncertain choice with realistic alternatives and named authority?
  2. 02

    Control requirements and scenarios

    Translate the operating mechanism into testable needs without prescribing a favored product.

    • — Trace requirements to workflow steps, decisions, roles, data, integrations, controls, measures, exceptions, and service needs.
    • — Classify requirements as essential, differentiating, contextual, or deferrable.
    • — Write representative normal, exception, failure, recovery, reporting, and administration scenarios.
    • — Define data ownership, access, portability, retention, privacy, security, audit, support, and exit requirements.
    • — Approve evaluation weights and disqualifying conditions before vendor scoring.
    Responsible
    Selection lead or process architect
    Output
    Requirements and Scenario Set · Evaluation Model
    Decision
    Are requirements testable, prioritized, and sufficient to protect the operating outcome?
  3. 03

    Form the viable option set

    Create genuine competition among options that can plausibly fit the decision.

    • — Research current-state improvement, build, buy, partner, and integration paths proportionate to the decision.
    • — Apply transparent entry and disqualification criteria.
    • — Screen vendor viability, product direction, customer fit, ecosystem, support model, and known implementation dependencies.
    • — Record conflicts, commercial relationships, information sources, and reasons for inclusion or exclusion.
    • — Shortlist only options worthy of deeper evidence collection.
    Responsible
    Selection lead or process architect
    Output
    Option Longlist · Controlled Shortlist
    Decision
    Which options are sufficiently viable to justify detailed evaluation?
  4. 04

    Test fit and collect evidence

    Replace feature claims and polished demonstrations with comparable evidence against real work.

    • — Provide the same controlled requirements, scenarios, questions, and response format to each option.
    • — Run scripted demonstrations using representative workflows, data, exceptions, administration, reporting, and recovery.
    • — Inspect integration approach, data access and export, configuration, controls, auditability, support, roadmap, and implementation model.
    • — Use references, sandbox tests, proof of concept, or pilot where uncertainty and consequences justify the effort.
    • — Record evidence strength, assumptions, gaps, workarounds, dependencies, and vendor commitments.
    Responsible
    Selection lead or process architect
    Output
    Comparable Option Evidence · Requirement Fit Matrix
    Decision
    Is the evidence sufficient to distinguish material fit and risk?
  5. 05

    Evaluate whole-life fit, economics, and risk

    Compare the complete operating choice rather than license price or feature count.

    • — Score essential and differentiating fit using the approved model.
    • — Estimate implementation, integration, migration, configuration, internal labor, training, support, change, renewal, growth, and exit costs.
    • — Assess time to value, reversibility, vendor dependency, data portability, roadmap, service, security, privacy, resilience, and context-specific risk.
    • — Model benefits, uncertainty, assumptions, intangible value, and the cost of delay or wrong choice.
    • — Run sensitivity and scenario tests on decision-driving assumptions.
    Responsible
    Selection lead or process architect
    Output
    Whole-Life Options Evaluation
  6. 06

    Decide and condition the choice

    Make an unambiguous client decision while preserving disagreement, conditions, and residual risk.

    • — Conduct open review with business, process, technical, data, financial, procurement, user, and relevant risk perspectives.
    • — Resolve factual gaps and distinguish evidence from preference.
    • — Select, reject, defer, or return for targeted evidence.
    • — Record rationale, dissent, residual risks, required contractual terms, implementation conditions, and approval authorities.
    • — Keep commercial negotiation conditional on the approved decision boundaries.
    Responsible
    Client business owner
    Output
    Provisional System Decision · Commercial and Risk Conditions
    Decision
    Which option, if any, best meets the approved operating need within acceptable economics and risk?
  7. 07

    Authorize and hand off the system decision

    Turn the selection into a controlled implementation input and future review baseline.

    • — Confirm negotiated terms remain within approved data, service, commercial, risk, implementation, and exit boundaries.
    • — Record final approval, funding, contract owner, system owner, process owner, data owner, and implementation authority.
    • — Package requirements, scenarios, evidence, commitments, assumptions, risks, economics, and rejected alternatives.
    • — Define outcome, adoption, service, exception, guardrail, renewal, and exit review points.
    • — Transfer the package to implementation and preserve the decision record.
    Responsible
    Client business owner
    Output
    Authorized System Decision · Implementation Decision Package
    Decision
    Do final terms and ownership satisfy the authorized decision conditions?

Connections

Seams · 11 hops within 2 steps

Upstream and downstream neighbourhood over public reference processes only. Each hop shows the trigger, carried objects, and what the receiving process loses if the producing step is skipped.

downstream · hop 1

Open process

Implement a Business System

Trigger · Final terms and ownership satisfy the authorized decision conditions.

Carries · Authorized System Decision · Implementation Decision Package

If Authorize and hand off the system decision is skipped, Implement a Business System loses Authorized System Decision · Implementation Decision Package.

upstream · hop 1

Open process

Architect a People Management System

Trigger · The roadmap authorizes technology selection.

Carries · Technical Capability Charter · Target System Architecture

If Architect components and interfaces is skipped, Select a Business System loses Technical Capability Charter · Target System Architecture.

upstream · hop 1

Open process

Operate and Improve a Process

Trigger · An approved improvement requires a consequential system choice.

Carries · Change Authorization · Improvement Proposal · Process Control Record

If Establish operating control; Design and authorize improvement is skipped, Select a Business System loses Change Authorization · Improvement Proposal · Process Control Record.

upstream · hop 1

Open process

Redesign Work and Workflow

Trigger · The approved design requires a new system or material replacement decision.

Carries · Approved Workflow Specification

If Validate and authorize the design is skipped, Select a Business System loses Approved Workflow Specification.

downstream · hop 2

Open process

Design and Govern a People Policy

Trigger · The system roadmap authorizes policy design or revision.

Carries · Policy Design Charter · Target System Architecture

If Architect components and interfaces is skipped, Design and Govern a People Policy loses Policy Design Charter · Target System Architecture.

upstream · hop 2

Open process

Approve Workforce Need and Headcount

Trigger · The approved response includes redesigning, reallocating, stopping, or automating work.

Carries · Workforce Decision · Capacity and Capability Assessment

If Assess capacity and capability is skipped, Redesign Work and Workflow loses Workforce Decision · Capacity and Capability Assessment.

upstream · hop 2

Open process

Design and Validate a Recurring Human Practice

Trigger · The practice passes bounded validation and readiness gates.

Carries · Authorized Practice Version · Practice Health Plan

If Authorize, enable, and introduce the practice is skipped, Operate and Improve a Process loses Authorized Practice Version · Practice Health Plan.

upstream · hop 2

Open process

Discover and Synthesize Process Evidence

Trigger · Architecture requires evidence beyond the current approved estate.

Carries · Process Evidence Packet

If the handoff from Discover and Synthesize Process Evidence is skipped, Architect a People Management System loses Process Evidence Packet.

upstream · hop 2

Open process

Manage Team Capacity and Priorities

Trigger · Capacity review identifies work or process design as a material cause.

Carries · Capacity and Priority Review · Improvement Handoff

If Review outcomes and improve capacity design is skipped, Redesign Work and Workflow loses Capacity and Priority Review · Improvement Handoff.

upstream · hop 2

Open process

Onboard the New Hire

Trigger · The manager accepts transition to normal operation.

Carries · Onboarding Transition Record · Improvement Inputs

If Transition to normal operation and improve is skipped, Operate and Improve a Process loses Onboarding Transition Record · Improvement Inputs.

upstream · hop 2

Open process

Review Manager-System Health

Trigger · The diagnosis identifies work or process design as a material cause.

Carries · Improvement Handoff

If the handoff from Review Manager-System Health is skipped, Redesign Work and Workflow loses Improvement Handoff.

Roles

Client business owner

Owns the operating need, economics, final selection, conditions, funding, and residual business risk.

Selection lead or process architect

Operates the method, protects comparability, integrates evidence, and prepares the decision.

Process owner

Owns workflow fit, operating requirements, exceptions, controls, and process outcomes.

System architect or IT owner

Assesses architecture, integration, reliability, supportability, access, and technical lifecycle.

Data owner

Assesses definitions, quality, migration, access, portability, retention, and downstream use.

Finance and procurement

Tests whole-life economics, vendor and commercial terms, authority, and negotiation.

Representative user

Tests the real workflow, exceptions, administration, learning burden, and usability.

Systems + Data

Data object

System Decision Brief

Controls the need, alternatives, authority, boundaries, consequences, and evidence standard.

System of record · Process and decision repository

Data object

Requirements and Evidence Record

Connects each operating need to tests, option evidence, scores, gaps, and commitments.

System of record · Selection management repository

Data object

System Decision

Preserves the authorized choice and implementation contract.

System of record · Process and decision repository

Versioned requirements and decision repository

Required

Controls criteria, scenarios, evidence, scoring, decisions, approvals, and changes.

Secure vendor and document exchange

Required

Manages comparable responses and sensitive technical, data, risk, and commercial evidence.

Evaluation sandbox or pilot environment

Contextual

Supports hands-on evidence where demonstrations and references cannot reduce material uncertainty.

Commercial and vendor-risk management

Required

Controls proposals, due diligence, terms, approvals, obligations, renewal, and exit conditions.

Measures

outcome

Realized operating outcome

After implementation, does the selected system enable the outcome that justified selection?

The chartered operating outcome reviewed against baseline and selection assumptions without attributing all change to the system alone.

At planned post-implementation reviews

quality

Essential-requirement evidence coverage

Was every essential requirement supported by sufficient evidence before decision?

Essential requirements with an approved test and sufficient evidence divided by all essential requirements.

At decision gate

cycle-time

Selection cycle time

How long does a decision-ready system need take to reach authorization?

Elapsed time from entry-gate approval to Authorized System Decision, segmented by stage and waiting cause.

Per selection; reviewed quarterly

adoption

Implementation package adoption

Does implementation use the controlled requirements, commitments, assumptions, and risks?

Required implementation artifacts linked to the Authorized System Decision divided by all required artifacts.

At implementation charter and design gates

exceptions

Material late-requirement rate

How often are material requirements discovered only after selection?

Material requirements first identified after authorization divided by all material requirements, classified by cause.

At implementation reviews

guardrail

Data and dependency guardrail

Has the choice created unacceptable data, vendor, cost, service, or exit dependency?

Review of data access and portability, integration dependency, switching cost, renewal exposure, vendor health, support, and exit feasibility.

At implementation acceptance and before renewal

Evidence + judgment

People Analytics Technology Procurement Checklist

source-derived

Supports business-need fit, core integrations, vendor track record and viability, support, data ownership, privacy and ethics, and pilot evidence.

bicycle-guide · build-a-people-analytics-function · people-analytics-technology-procurement-checklist

Requirements for Defining a Decision

source-derived

Supports requiring realistic alternatives, uncertainty about the best choice, consequences of error, and an identifiable decision maker.

bicycle-guide · tool-requirements-for-defining-a-decision · build-a-people-analytics-function.artifact.json

Pre-Project ROI Forecasting

source-derived

Supports explicit objectives, impact estimates, uncertainty, fully loaded costs, intangible benefits, and transparent assumptions before commitment.

bicycle-guide · build-a-people-analytics-function · pre-project-roi-forecasting

The Universal Measurement Approach (AIE)

cross-source-synthesis

Supports measuring the uncertainties most valuable to the decision and stopping when additional evidence is not economically justified.

bicycle-guide · tool-the-universal-measurement-approach-aie · build-a-people-analytics-function.artifact.json

The Ideal Decision-Making Process

cross-source-synthesis

Supports open disagreement and knowledge-sharing followed by a clear decision and implementation commitment.

bicycle-guide · build-a-people-analytics-function · the-ideal-decision-making-process

Lock work-before-system principle

lock-judgment

Lock judgment: a system choice begins from the work and required operating capability, not the software category.

lock · what-lock-is

Lock operating-requirements principle

lock-judgment

Lock judgment: workflow, roles, decisions, data, interfaces, controls, measures, exceptions, and support become traceable system requirements.

lock · lock-method

Lock independent-selection principle

lock-judgment

Lock judgment: Lock designs the choice but does not own, resell, or receive undisclosed influence from the selected system.

lock · what-lock-is

Lock evidence-over-demo principle

lock-judgment

Lock judgment: options are tested against shared client scenarios and evidence rules rather than vendor-selected feature tours.

lock · lock-method

Lock client-decision boundary

lock-judgment

Lock judgment: Lock may architect and facilitate the selection; the client owns the choice, contract, system, and residual risk.

lock · what-lock-is

Lock connected-selection principle

lock-judgment

Lock judgment: selection is complete only when it produces controlled inputs for implementation and future operation, renewal, and exit review.

lock · lock-method

Draft reference standard. Requires practitioner and context-specific procurement, legal, finance, accounting, tax, architecture, security, privacy, risk, quality, validation, accessibility, and worker-impact review before client deployment.